The paper summarizes the comprehensive water prevention and control technology on 31201 working face in Jinjie mine. Working face design, drainage system layout and ground equipments construction are introduced and analyzed at length. The effect is evalua%详细总结了锦界煤矿31201面综合防治水技术措施,从工作面设计、排水系统布置及地面设施建设等方面进行了阐述和分析,对防治水工作进行了效果评价。通过建立井上下立体式防治水网络,实现了矿井的安全生产和矿井水的资源化综合利用。
展开▼