Based on a super high-rise building engineering in Xi’an,this paper expounds the working principle,system composition,construc-tion steps of hydraulic climbing formwork. The author design its construction scheme of the hydraulic climbing formwork,and the problems holes in the wall and vertical channel were solved. Analyzed its stress in three conditions,the result showed its safety of the formwork,and it’s well used in construction.%结合西安某超高层建筑,介绍了液压爬升模板的原理、系统组成、工作流程,并对该工程的液压爬模施工方案进行了设计,重点解决了墙体开洞及架体垂直运输等难题,通过对三种不同工况的受力分析,表明爬模架体结构安全,施工过程安全可靠。
展开▼