Through the introduction of a large waterworks project process design and process for the preparation of civil construction engineering bidding control price,the paper analyzes civil economic indicators of large waterworks project in the process conditions. Through the process of scheme selection,the best solution can be selected.%通过介绍某大型净水厂工程的工艺设计方案以及相关土建工程招标控制价的编制过程,分析了大型净水厂工程在该工艺条件下的土建经济指标,通过工艺方案比选,选出了经济效果最优的工艺方案。
展开▼