In light of hydrological conditions and surrounding environment of new Tianjin coastal region environment monitoring alarm center engi-neering,the paper puts forward steel sheet pile foundation support scheme,and describes the steel sheet pile setting and removing and other con-struction points. Through displacement monitoring,it shows that:the scheme achieves great support effect.%针对天津滨海新区环境监测预警中心工程的水文地质条件及周边环境,提出了钢板桩基坑支护方案,并阐述了钢板桩打设、拔除等施工要点,通过位移监测表明,该方案取得了良好的支护效果。
展开▼