The end of the first transition bracket slot along the whole after installation cut in steep slope, difficult delegated, can not meet the require- ments of the safety factor to determine the cut eye mounting bracket by way of the Yangcheng coal face 1307 successfully applied to achieve a quick instal- lation, the installation process to solve the problem of safe transport.%阳城煤矿针对13072工作面端头过渡支架顺槽内整体安装完毕后,切眼坡度大,下放难度较大,不能满足安全系数要求的情况,确定了切眼内安装支架的方法,实现了快速安装,解决了安装过程中安全运输的难题。
展开▼