In this paper, it introduces the transportation and construction method of installation for large steel box girder of the expressway overpass connecting Ordos Kang Bashi-Airport expressway and Baotou-Maoming Expressway, puts forward the solutions to construction difficulties caused by factors such as site, road surface, overhead lines, and provides reference for the similar bridge construction operation in the future.%文章介绍了鄂尔多斯康巴什至机场高速公路与包茂高速公路立交桥特大型钢箱桥梁运输、安装施工方法,对因场地、路面、架空线路等因素造成的施工难点有针对性的提出了解决办法,为今后类似的桥梁施工作业提供参考.
展开▼