According to leak situation of cable warehouse of a 110kV cable line, combining with theoretical study and the installation technology of this factory,this paper analyzed the cause of air leakage of cable warehouse in detail.Via the analysis of air leakage of the cable line terminal,the company has to set professional technician in the construction team,and store image data aimed at key link of construction process, implementation of whole process quality control and data storage of cable accessories installation,improve the accuracy and objectivity of records,guarantee the quality of cable accessories installation.%本文通过对110kV某电缆线路电缆仓漏气情况回顾,结合理论及该厂家的安装工艺,详细分析了导致电缆仓漏气的原因。通过对某电缆线路终端漏气情况分析,公司在施工班组设置了专职技术员,对施工过程中关键环节储存影像资料,实现对电缆附件安装的全程质量管控与资料储存,提高记录的准确性和客观性,保证电缆附件安装的质量。
展开▼