首页> 美国政府科技报告 >Kajakai: 110KV Transmission Line Study and Revised Cost Comparison of Transmission Line Voltage Alternates
【24h】

Kajakai: 110KV Transmission Line Study and Revised Cost Comparison of Transmission Line Voltage Alternates

机译:Kajakai:110KV输电线路研究和输电线路电压交替的修正成本比较

获取原文

摘要

This report incorporates the results of a study made in response to the request contained in the letter dated February 15, 1971, from Mr. Hamidullah Hamid, General President of Da Afghanistan breshna Moassessa, to International Engineering Company, Inc. Its purpose is twofold: (1) To investigate the technical feasibility of using 110 kV for transmission of Kajakai power to the Lashkar Gah-Girishk area and to Kandahar and, if feasibility is proven, to determine the necessary conditions for successful operation under increasing loads. These conditions include the location of the substation serving Lashkar Gab/ Girishk, the number, routing, and timing of 44kV circuits terminating at that substation, the quantity of shunt capacitance, transformer tap settings and bus voltages. (2) To revise the cost comparison between alternate transmission voltages and transmission schemes. The latest previous comparison is part of a report entitled Preliminary Plans Wakai Hydroelectric Power Plant, issued in May 1970. Since that time three concepts have changed, resulting in a significantly changed basis for evaluation. These concepts are: first , the direct route from Kajakai to Kandahar has been abandoned and all transmission schemes under consideration use the same route; second, the high voltage substation serving Lashkar Gah/ Girishk has been moved from Girishk to a nearby locationon the Kajakai- Kandahar line, thereby eliminating the 20 km high voltage tap which was part of all previous schemes; third, application of switchable shunt capacitors at the load substations makes possible the transmission of over 50 MW on a single 110 kV circuit and over 100 MW on a single 161 kV circuit. These line capacities and the feasibility of the substation location mentioned above are established by the 110 kV transmission line study described herein and the 161 kV transmission line study which was the subject of the February, 1971 report.

著录项

  • 作者

  • 作者单位
  • 年度 1971
  • 页码 1-119
  • 总页数 119
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号