首页> 中文期刊>铁路通信信号工程技术 >郑州东枢纽RBC设置方案研究

郑州东枢纽RBC设置方案研究

     

摘要

为合理规划郑州东枢纽RBC设置,既能满足郑徐客专的引入,又能为后期工程郑万铁路和郑济铁路接入预留条件,避免后期工程建设时对郑州东枢纽RBC设置带来较大改动,结合既有郑州枢纽RBC的设置现状及RBC的技术要求,对郑州东枢纽RBC的设置方案进行研究。%Setting reasonably RBC in Zhengzhou east junction can meet the demands of connecting with Zheng-Xu passenger dedicated line and reserving conditions for the connection of both Zheng-Wan and Zheng-Ji railway lines, which can avoid modiifcations to the RBC setting here in the following project. This paper studies the RBC setting in Zhengzhou east junction based on the existing situation of RBC setting and technical requirements.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号