In view of the special engineering hydrogeological environment of Guiyang—Guangzhou Passenger Dedicated Line,effective results are achieved by comprehensive adoption of engineering measures like corrosion resistant high performance concrete and improvement of the longitudinal circumferential drainage blind pipes joint to solve the tunnel drainage system clogging and leakage problems.%针对贵广客运专线工程所处特殊的水文地质环境,综合采用防腐蚀高性能混凝土和改进纵环向排水盲管接头形式的工程措施,解决隧道排水系统的堵塞和渗漏水问题。工程应用结果表明成效明显。
展开▼