乌鲁木齐地铁一号线06标段工程南湖北路站位于南湖北路上,结构施工前需将 BRT 快速公交车站(以后简称 BRT)整体平移400 m。通过理论计算及实际成功操作,总结出长跨度构件整体平移施工步骤及验算要点。%The South Lake North Road Station of Urumqi Metro Line 1 Lot 06 project is located on South Lake Road.Before the construction,the BRT rapid bus station(hereafter referred to as BRT)is needed to be translated 400 m in general. Through theoretical calculation and actual operation,this paper sums up the construction steps and checking points of over-all translation for long span components.