静海水电站采用混凝土砌石重力坝作为水电站拦河坝,从方便施工和宜于质量控制两方面出发,拟用高流态混凝土胶结堆石筑坝技术,通过现场试验,论证了混凝土胶结堆石坝技术措施效果明显,该技术能够满足大坝设计要求,并且具有施工效率高、经济效益好、质量稳定等优点.%Jinghai Hydropower Station adopts concrete masonry gravity dam as hydropower dam. Considering of facilitating the construction and appropriate for quality control, the construction technology of cementation and rock filled with flowing concrete is a good choice. Through on-site test, the results show that the technology is very effective. The technology can meet the design requirements of the dam, and has the good construction efficiency, economic, and structure stability.