This paper proposes the principle, method and critical control points for engineering consulting of ETY fan of nuclear power station, through the introduction and analysis of design feature, difficulties in development of ETY fan (nuclear safety equipment) for containment atmosphere monitoring system of nuclear power units with the 2nd generation improved technologies and by way of practice and exploration of nuclear power plant engineering consulting. It provides valuable experiences for reference for improving working effciency of engineering consulting, enhancing and improving standards in quality control.%通过对二代改进型核电机组安全壳大气监测系统(ETY)核级风机的结构特点、研发难点的介绍和分析,结合核电设备监理的实践、探索,提出核电站ETY风机设备监理的原则、方法和关键控制点。为提高监理工作效率,加强和改进质量控制水平,提供了有益借鉴。
展开▼