Combined with the field measurement of construction process for cable - stayed bridge with a single tower along Taizi River landscape road, the cable force measurement, main tower deformation monitoring, tower top displacement measurement and main beam and tower pile/s strain measurement are emphatically introduced to provide reference for similar projects.%结合太子河景观路独塔斜拉桥斜拉索施工过程中的现场量测工作,重点介绍了索力测试、主梁变形监测、塔顶变位测量、主梁与塔柱应变测量等,为类似工程提供参考。
展开▼