分区确定长露天采场生产能力

         

摘要

铜街-曼家寨矿段露天采场具有上部剥离岩石量多,采出矿石量少,下部则反之的矿岩分布特点,设计以1080 m为分界将露天采场划分为Ⅰ、Ⅱ采区,结合Ⅰ、Ⅱ采区不同采剥工艺、台阶参数、穿孔设备、铲装设备、运输设备及不同的爆破孔网参数、运输道路参数、贫损指标等,按分区用多种方法进行计算和论证,使生产规模论证更科学、更具可操作性。%The open pit at Tongjie -Manjiazai ore-block is characterized by ore -bearing rock distribution of more stripping rock volume and fewer mined ore on upper part , but on the contrary at lower part .In the design , the open pit is divided into I and Ⅱ mining areas at 1 080 m as boundary .Combined the different stripping process , step parameters, perforation equipment ,shovel loading equipment , transportation equipment and differ-ent blasting holes network and road transport parameters , dilution loss index etc .for I andⅡmining areas , cal-culation and verification were carried through by various methods according to subarea so that made the verifica -tion of production scale more scientific and operable .

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号