The operation of key equipments for the preparation of coal slurry in Shenhua Baotou 1.8 Mt/a coal to methanol project was summarized. The problems and solutions of the operation of rod mill, low pressure coal slurry pump, coal slurry tank blender, high pressure coal slurry pump were discussed and described.%总结了神华包头180万t/a煤制甲醇项目气化装置煤浆制备关键设备的运行情况,针对棒磨机、低压煤浆泵、煤浆大槽搅拌器、高压煤浆泵的运行情况、出现的问题及解决办法进行了阐述.
展开▼