首页> 中文期刊>现代制造工程 >工作研究应用于企业生产线优化再设计--案例研究

工作研究应用于企业生产线优化再设计--案例研究

     

摘要

A work study method is used to optimize and re-design core products production line of GY company .With the dada collected from field observation ,5W1H questions technology ,stopwatch measurement ,cause and effect diagram ,and man-machine operation analysis are used applied to study production bottleneck process and its causes .The workstation work missions have been redesigned according to eliminate bottleneck process that has increased 1 ATE test machine and reduce one operator so as to make production line as balance .The results show that production line balancing rate promotes by 29 .9%,per hour capacity in-creases 132PCS,and each product cost reduces 0.227RMB.%运用工作研究方法对GY公司核心产品生产线的生产流程进行优化和再设计。根据实地观察获得的数据,应用5 W1 H提问技术、工时测定和人机作业分析等方法分析生产瓶颈工序及其产生原因。提出通过消除瓶颈工序、减少总检工序工位和人员冗余等措施,对作业工位的工作任务进行了重新设计,增加了1台ATE测试机器和减少了1个作业员。优化设计后的结果显示,生产线平衡率提升了29.9%,每小时产能提升了132PCS,每件产品制造成本减少了0.227元RMB。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号