首页> 中文期刊>金属矿山 >露天矿采矿作业计划的二元整数规划数学模型

露天矿采矿作业计划的二元整数规划数学模型

     

摘要

In order tomaximize the net present value,a new operative planningmodel for an open-pitmine based on bi-nary integer programming is proposed in the case of simultaneous optimization of boundarygrade and optimization ofmining or-der.Themodel consists of three parts:①actual economic losses;②probability distribution and averagegrade;③expected eco-nomic loss.The economic loss evaluation and probability of a lump of ore are integrated into a two-element integer programmingmodel through physical constraints.Themodel is based on the optimal processing decision to determine the optimalmining or-der for each period.In order to verify the applicability of the proposedmodel,a case study of agoldmine was carried out.The result showed that it is feasible to use thismodel toget themining sequence.Themodel can obtain higher optimal net present value in a reasonable time.%在同时考虑边界品位优化和开采顺序优化情况下,为了实现最大化净现值,提出了一种新的基于二元整数规划的露天矿作业计划模型.该模型包含3个部分:①实际经济损失;②概率分布和平均品位;③预期经济损失.通过物理约束将一个矿块的经济损失评估与概率集成在一个二元整数规划模型中.该模型基于最佳加工决策来确定每个时期的最优开采顺序.为了验证提出模型的适用性,对某金矿案例进行了研究分析.结果表明:使用提出模型获取到的开采顺序是切实可行的,该模型可以在合理的时间内得到较高的最优净现值.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号