首页> 中文期刊>力学与实践 >小浪底工程中的关键力学问题

小浪底工程中的关键力学问题

     

摘要

he Yellow River Xiaolangdi Project is characterizedby large scale, important geographic location, complicated geologicalconditions, strict operational requirements and unique water andsediment regime, thus becomes one of the most challenging water projectsin the world. The technical complexity of the project is mainly due toits complicated geological conditions and high sediment concentration ofthe Yellow River flow. Major technical problems have been solved in thefields of soil mechanics and soil dynamics, rock mechanics, structuralmechanics and structural dynamics and water engineering hydraulics,and have also pushed forward the development of the testing and ana lysismethods in engineering mechanics.%黄河小浪底工程规模宏大、地理位置重要、地质条件复杂、运用要求严格、水沙条件特殊,被称为世界上最具挑战性的水利工程之一. 坝址区复杂的地质和黄河高含沙水流是小浪底工程技术复杂的主导因素. 在土力学和土动力学、岩石力学、结构力学和结构动力学、水工水力学等多个力学领域中解决了关键技术问题,在一定程度上推动了工程力学中的试验分析方法和分析手段的发展.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号