由于工艺布置和建筑造型的需要,供热站主厂房设计变得相当复杂与繁琐,文中通过工程实例对其进行分析,表明工艺之间相互配合、在充分利用平面和竖向空间基础上、能够达到工艺顺畅和结构抗震性能良好的统一.%Due to the need of process layout and architectural modeling,the design of the main plant of heating station has become quite complex and cumbersome.This paper analyzes it through the engineering example,ndicating that the process of mutual cooperation,in full use of the plane and vertical space on the basis of the process to achieve smooth and structural seismic performance of a good unity.
展开▼