首页> 中文期刊>物流技术 >基于动态事件调度仿真的高速铁路动车组运用计划计算机协同编制方法的研究

基于动态事件调度仿真的高速铁路动车组运用计划计算机协同编制方法的研究

     

摘要

依据动车组运用的牵引动力与载客装置不可分离的原则,动车组挂运接续和列车运行线的时点是一致的,因此将这些时点作为变量,考虑动车组整备维修、动车组站段折返接续作业时间、列车运行线铺画约束、列车挂运匹配等条件,建立以动车组运用效率和列车运行计划均衡性为指标的基本模型,采用动态事件表调度方法实现可行方案编制,研究站间固定区段运用模式下,单基地多车种的动车组运用计划与成对列车运行计划协同编制问题.最后以京津客运专线实际条件模拟编制动车运用计划,以验证模型与算法的可行性.%Due to the inseparability of the traction and power mechanism and the car-body of EMU, the paper takes the time point for car-body connecting as consistent with those in the operation timetable. As a result, it formulates a basic model which, with these time points as variables, takes into consideration factors such as train set maintenance time, returning and connecting time, operation paving constraint and train-set connection compatibility, etc. Operational efficiency and timetable balance as the index, the model uses dynamic event scheduling to obtain the feasible plans and studies the collaborated timetable scheduling problem for hetero-vehicle single-base EMU plans and coupled train operation plans for a certain rail-line section. Finally, in a numerical study which simulates the actual situation of the Jing-Jin dedicated passenger line, the paper works out an EMU scheduling plan which can be used to verify the feasiblity of the model and algorithm.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号