This article presents the current production status of crushing and milling system of copper slag.The two section production system is transformed by employing the feeder,discharge device and new type crusher with 400×900mm diameter,it is proved that granularity of slag is more suitable for the requirements,and handling capacity goes doubled.As a result,the unit consumption of crushing and milling is down to 7.5kwh/t and the consumption of steel ball,materials and spare parts is dramatically reduced.%基于铜炉渣破磨系统的生产现状,采用400×900mm破碎机和滚动主轴承的新型溢流球磨机,改造现有二段磨渣(矿)生产系统,结果磨渣产品粒度更符合要求,处理量翻一番,破磨单耗由35kwh/t下降到7.5kwh/t左右,并大幅度减少钢球、材料和备件的消耗。
展开▼