A single machine scheduling problem involving fuzzy due dates and fuzzy precedence constraints is investigated. The fuzzy precedence reflects the satisfaction level with respect to precedence between two jobs. A membership function is associated with each job Ji, which describes the degree of satisfaction with respect to completion time of Ji. For the bi-criteria scheduling problem, an O ( n3 ) algorithm is proposed for finding nondominated solutions.
展开▼