Using the program 50tEBT-LF-VD-caster, special steel plant of Benxi steel produces gear steel FAS 3420H, In order to avoid the nozzle clogging during continuous casting , we carry out such measures as controlling the terminal carbon of electric furnace≥0.07, controlling 〔S〕,〔Al〕 and Ca/Al values according to the target composition , keeping the casting superheat at 25-40℃, and work pulling speed at 0.90 m/min.As a result, the continuous times increase from 3-6 to 9-10.%本钢特殊钢厂采用50t EBT-LF-VD-连铸(235mm ×265mm)生产 FAS3420H齿轮钢。通过控制电炉终点碳≥0.07%,按目标成分控制〔S〕、〔Al〕及Ca/Al值,连铸钢水过热度25~40℃,工作拉速0.90m/min等工艺措施,避免了连铸过程的水口堵塞,使得连铸连浇炉数由3~6炉提高到9~11炉。