在分析战时维修任务发生特点的前提下,提出了一种战时维修任务的动态调度方法.该方法以有限时间内尽量恢复作战单元的作战效能为目标对维修任务进行实时调度,并且考虑了各维修任务团队互相支援的情况,提出相应的应对策略,对部队维修保障决策有一定的参考价值.%A dynamic scheduling method of wartime maintenance mission is put forward based on the analysis of the features of wartime maintenance mission. Taking cases of mutual support among different maintenance mission teams into consideration and bringing forward the corresponding coping strategies, this method suggests a real-time scheduling of maintenance mission to restore the battle capability of battle units as soon as possible within limited time, hence has reference value for decision-making of maintenance support.
展开▼