Based on the analyses of the FCB control logic and actions of electrical equipment of the advanced F-class gas turbine, in combination with the features of CHP projects of “one driving one” IGCC,this article introduces the key issues during the practice process of the FCB function in the multi-shaft IGCC project.The FCB experiment proves successful in the real operating condition with 100% load.%通过对F级改进型燃机FCB控制逻辑及电气设备动作的分析,结合一拖一燃气—蒸汽联合循环热电联产项目的特点,提出FCB功能在多轴燃气—蒸汽联合循环项目的实践过程中应关注的重点问题,介绍了全真实运行工况100%负荷的FCB试验成功的情况。
展开▼