With the continuous improvement of the socio-economic level in China, the construction of water conservancy and hydropower project in size and numbers have reached the highest level since 1949;Combining with Pangduo water control project of Tibet, with asphalt concrete cut-off wall construction methods, construction techniques, mixing station layout, mixing asphalt mixture, the construction machine configuration and quality control, this paper summed up for high altitude reservoir engineering asphalt concrete cut-off wall construction quality control and management, which provides a reference for the similar project construction.% 随着我国社会经济水平的不断提高,水利水电工程建设在规模上、数量上都达到了建国以来的最高水平;本文结合西藏旁多水利枢纽工程沥青砼心墙施工方法、施工工艺、拌和站布置、沥青混合料拌制、施工机械配置及质量控制等,总结出适用于高海拔地区水库工程沥青砼心墙施工质量控制与管理方法。笔者总结出来,供大家在以后从事类似工程施工中借鉴或参考。
展开▼