The layout and characteristics of the rack in the entry of lower water head plants without storage are introduced from design view. Combined with the project example of Xiashan Hydropower Station, the structure layout of the external type rack in the entry and the scheme comparison and selection from civil engineering and metal structure are stated in this paper.%从设计角度介绍了低水头径流式水电站进水口拦污栅布置形式和特点。结合峡山水电站工程实例,阐述进水口外置式拦污栅结构布置形式,以及从土建、金属结构方面进行了方案比选。
展开▼