The spoil ground of the highway from Daqing to Cuangzhou( the section from Longnan Liren to Yangcun )was selected as the object in this paper. The information about the design and operation of the spoil ground during the highway construction were introduced,some suggestions were made after the analysis and conclusion of the site selection rationality and measures scientific to the spoil ground reselection. The results of this paper provided a reference for the soil erosion control measurement reselection in similar spoil ground.%本研究选取大庆至广州国家高速公路龙南里仁至杨村(赣粤界)段的弃土场为对象,对工程建设过程中设计与实际使用的弃土场的变更情况进行了介绍,并针对弃土场变更过程中存在的选址合理性、措施科学性等问题进行了分析及归纳,提出了建议,为同类项目弃土场的变更水土保持措施设计提供技术参考。
展开▼