王家岭煤矿副井为大断面长距离斜井,施工中采用了成熟的斜井机械作业线和掘砌滚班正规循环作业,合理组织相关工序平行施工,刷新江西省大断面斜井快速、优质、安全施工新记录。%The author introduces the parallel construction of mature slope-shaft mechanized line and normal circulation operation with driving-lining shifts on large-sections and long-distance slope shaft of Wangjialing Colliery,which has broken the new provincial r
展开▼