首页> 外文期刊>国际泥沙研究(英文版) >Wide river or narrow river:Future river training strategy for Lower Yellow River under global change
【24h】

Wide river or narrow river:Future river training strategy for Lower Yellow River under global change

机译:阔河或狭窄的河流:未来河流训练战略为下黄河下的全球变化

获取原文
获取原文并翻译 | 示例
       

摘要

The choice of a river training strategy is extremely important for the Lower Yellow River(LYR). Currently,the wide-river training strategy applies in the training of the LYR. However, remarkable changes in the hydrological processes in the Yellow River basin, as well as immediate pressure from socio-economic development in the Yellow River basin, make it necessary to consider if there is a possibility to change the river training strategy from wide-river training to narrow-river training. This research investigates the impacts of different river training strategies on the LYR through numerical simulations. A onedimensional(1-D) model was used to simulate the fluvial processes for the future 50 years and a threedimensional(3-D) model was applied to study typical floods. The study focused on river morphology, the results show that if the present decreasing trend in both water discharge and sediment load persists, the deposition rate in the LYR will further decrease no matter what strategy is applied. Especially, narrowriver training can achieve the aim to increase the sediment transport capacity in the LYR compared with wide-river training. However, if the incoming water and sediment load recovers to the mean level of the last century, main channel shrinkage due to sedimentation inevitably occurs for both wide-river and narrow-river training. Most importantly, this study shows that narrow-river training reduces the deposition amount over the whole LYR, but it provides little help in alleviating the development of the"suspended river". Instead, narrow-river training can cause aggradation in the transitional reach where the river pattern changes from highly wandering to meandering, further worsening the "hump deposition" there. Because of uncertainty regarding future changes in hydrological processes in the Yellow River basin, and the lack of feasible engineering measures to mitigate "suspended river" and"hump deposition" problems in the LYR, caution should be exercised with respect to changes in the river training strategy for the LYR.

著录项

  • 来源
    《国际泥沙研究(英文版)》 |2018年第3期|271-284|共14页
  • 作者单位

    State Key Laboratory of Hydroscience and Engineering Department of Hydraulic Engineering Tsinghua University Beijing 100084 China;

    Changjiang Institute of Survey Planning Design and Research Wuhan 430010 China;

    State Key Laboratory of Hydroscience and Engineering Department of Hydraulic Engineering Tsinghua University Beijing 100084 China;

    Joint-Sponsored State Key Laboratory of Plateau Ecology and Agriculture QingHai University Xining 810016 China;

    Center for Coastal Resource Management Virginia Institute of Marine Science 1375 Greate Road P.O. Box 1346 Gloucester Point VA 23062 USA;

    State Key Laboratory of Hydroscience and Engineering Department of Hydraulic Engineering Tsinghua University Beijing 100084 China;

    State Key Laboratory of Hydroscience and Engineering Department of Hydraulic Engineering Tsinghua University Beijing 100084 China;

    Water Resources Department Changjiang River Scientific Research Institute Wuhan 430010 China;

    State Key Laboratory of Hydroscience and Engineering Department of Hydraulic Engineering Tsinghua University Beijing 100084 China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2024-03-12 16:30:21
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号