首页> 中文期刊> 《工业工程》 >基于ISM的核电站公众接受性模糊层次综合评价

基于ISM的核电站公众接受性模糊层次综合评价

         

摘要

On the basis of existing researches , the influence factors of public acceptance to nuclear power plant are summarized .By applying the method of interpretative structural modeling ( ISM) , the main influ-ence factors of public acceptance to nuclear power plant are identified such that an evaluation index system is constructed .With Daya Bay nuclear power plant in Guangdong as an example , its public acceptance is evaluated by applying the fuzzy analytic hierarchy process ( AHP) comprehensive evaluation method .It is concluded that the public acceptance to Daya Bay nuclear power plant is at the average level .There are some deficiencies in cognition , emotion, intention, trust, and participation in the controllability .As a so-lution, the Daya Bay nuclear power plant should take measures to improve the level of public acceptance . These measures include popularizing nuclear power plant knowledge , establishing the linkage news release mechanism , strengthening supervision and management , intensifying communication with the public , im-proving public participation , and so on .%在借鉴已有研究的基础上,归纳了核电站公众接受性影响因素,运用解释结构模型法(ISM)从中识别核电站公众接受性的主要影响因素,据此构建涵盖主要影响因素的核电站公众接受性评价指标体系。以广东大亚湾核电站为例,运用模糊层次综合评价法对其公众接受性进行综合评价,得出大亚湾核电站的整体公众接受性处于一般水平,在认知因素、情感因素、意图因素、信任因素、参与可控制性等方面存在着不足。据此,大亚湾核电站需要在核电站知识普及、建立联动新闻发布机制、强化监督管理、加强与民众沟通、提高民众参与性等方面制定提升公众接受性措施。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号