An optimized construction diversion plan can greatly shorten the construction period by creating a longer and more suitable working condition .In the construction of Banduo hydropower station in Yellow river , a diversion channel for the low water season is added .Also, the permanent structures are used for diversion .With this optimized diversion plan, good overall benefit is obtained .%为争取和创造施工条件,优化施工导流程序,缩短施工工期,黄河班多水电工程施工采用新增枯水期导流明渠和利用永久建筑物参与导流等措施。结果表明,优化的施工导流方案取得了较好的工程综合效益。