首页> 中文期刊>湖南农机 >大广高速公路K83+800~K93+000段软基工后沉降计算

大广高速公路K83+800~K93+000段软基工后沉降计算

     

摘要

对大庆至广州高速公路湖北省麻城至浠水段K83+800~K93+000沉降观测的基础上,根据对现场实测沉降曲线和修正双曲线模型、修正的指数曲线模型的预测结果的对比分析发现,修正的双曲线模型适合于此段以碎石桩为主的沉降预测。%Based on the observation and measurement Daqing to Guangzhou Expressway in Hubei Province, Macheng to Xishui section K83+800~K93+000, though the comparison and analysis of predicted results of the settlement curve measured in the field and the modified hyperbolic model, the modified index curve model, it is found that the modified hyperbolic curve model is suitable for settlement prediction of this section, which is mainly gravel piles.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号