场地环境、限额设计和国家队游泳集训需求等是项目限定因素,设计据此搜索平衡点,立足于形体控制、构造控制等方面,深入思考基于建筑本体的空间、材料、比例、尺度、构造等基本要素,达成诸多限定的平衡.%The limiting factors of the project include the site environment,limit design and swimming training requires for national team,so the design equilibrium point is explored according these,and the design strategy is realized in the form and structural control.Further thinking about the basic elements of space,material,scale,and structure,the equilibrium under limitation is achieved.
展开▼