Three Francis turbine-generator units with high water head and high rotate speed are installed in Malutang phase-2 hydropower station. By technical and economic comparison,and considering the manufacture capacity of domestic manufacturers,the main parameters and structure characteristics of turbine are reasonably selected to guar-antee the stable operation.%∶马鹿塘水电站二期工程装设三台高水头、高转速混流式水轮发电机组。经技术经济综合比较,并结合国内制造厂家的设计制造水平,对水轮机主要参数及结构形式进行合理选择,以保证机组的安全稳定运行。