The installation work of miter gate for Guiping second shiplock, characterized by high construction intensi-ty and difficulty and short construction period, is completed by working out reasonable construction scheme and im-proving traditional construction procedures. The paper introduces the installation process of the miter gate in detail.%桂平二线船闸人字门安装工程施工强度高、施工难度大、工期紧,通过对工程施工方案的精心策划,改善部分传统施工步骤,确保了工程建设目标的实现。文章详细介绍了人字门安装工艺过程。