An introduction was made on the basic information of the flood protection project in Quanshui town. For the flood dike sections in need of reinforcement, earth filling is designed on the river side to thicken the old dike, de-crease the permeability with bank slope stability up to requirements. The author discussed the structural types and engineering geological conditions of thickening old dike by earth filling, and presented the calculation and analysis conducted to check seepage and sliding stability of the concerned dike section.%介绍了泉水镇防洪治理工程的基本情况,其中加固防洪堤堤段是在原旧堤外江侧进行填土培厚,使该堤段渗透性降低,边坡稳定满足要求,论述了旧堤填土培厚的结构型式及工程地质条件,并对该堤段的渗流及抗滑稳定进行了计算分析。