首页> 中文期刊>广东水利水电 >广东前詹电厂2×1000MW机组温排水三维数值模拟研究

广东前詹电厂2×1000MW机组温排水三维数值模拟研究

     

摘要

通过建立工程海域三维数学模型,对电厂不同取、排水布置方案进行了模拟计算,分析了温排水在海域的扩散规律及电厂在运行期间其温排放引起的取水温升以及对厂址附近海域的影响,为电厂取排水工程的设计和环境影响评价提供科学依据。%Guangdong Qian Zhan power plant is located between the Goushu village and Chiao village of Huilai County of Jieyang city, Shenquan bay .Planning capacity of the power plant is 4 ×1000 MW, it construction of two phases , the first period of the pro-ject construction of 2 ×1000MW coal-fired unit.In this paper, with the establishment of three dimensional numerical model model of engineering area , different from of the power plant layout , different drainage , were simulation , base on the model the diffusion law of cooling water in the seas and the sea water temperature rise were analyzed .The analyzed result will provide scientific basis for the design and environmental impact assessment of the power plant .

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号