首页> 中文期刊> 《中国环境科学与工程前沿:英文版》 >Removal of arsenic by pilot-scale vertical flow constructed wetland

Removal of arsenic by pilot-scale vertical flow constructed wetland

         

摘要

Four pilot-scale Vertical Flow Constructed Wetlands(VFCWs)filled with gravel and planted with Phragmites australis were operated for seven months in the field to study the efficiency of arsenic removal in contaminated wastewater.The average arsenic removal efficiency by the VFCWs was 52.0%±20.2%,52.9%±21.3%,and 40.3%±19.4%at the theoretical concentrations of 50µg/L(CW50),100µg/L(CW100),and 500µg/L(CW500)arsenic in the wastewater,respectively.The results also showed no significant differences in the removal efficiency for conventional contaminants(nitrogen,phosphorus,or chemical oxygen demand)between wastewater treatments that did or did not contain arsenic(P>0.05),except for phosphorus in CW500.The highest average monthly removal rate of arsenic occurred in August(55.9%–74.5%)and the lowest in November(7.8%–15.5%).The arsenic removal efficiency of each VFCW was positively correlated with temperature(P<0.05).Arsenic accumulated in both substrates and plants,with greater accumulation associated with increased arsenic concentrations in the influent.The maximum accumulated arsenic concentrations in the substrates and plants at the end of the experiment were 4.47 mg/kg and 281.9 mg/kg,respectively,both present in CW500.The translocation factor(TF)of arsenic in the reeds was less than 1,with most of the arsenic accumulating in the roots.The arsenic mass balance indicated that substrate accumulation contributed most to arsenic removal(19.9%–30.4%),with lower levels in plants(3.8%–9.5%).In summary,VFCWs are effective for the treatment of arsenic-containing wastewater.

著录项

  • 来源
    《中国环境科学与工程前沿:英文版》 |2021年第4期|P.351-363|共13页
  • 作者单位

    State Key Laboratory of Freshwater Ecology and Biotechnology Institute of Hydrobiology Chinese Academy of Sciences Wuhan 430072 ChinaUniversity of Chinese Academy of Sciences Beijing 100049 China;

    State Key Laboratory of Freshwater Ecology and Biotechnology Institute of Hydrobiology Chinese Academy of Sciences Wuhan 430072 ChinaUniversity of Chinese Academy of Sciences Beijing 100049 China;

    State Key Laboratory of Freshwater Ecology and Biotechnology Institute of Hydrobiology Chinese Academy of Sciences Wuhan 430072 ChinaUniversity of Chinese Academy of Sciences Beijing 100049 China;

    State Key Laboratory of Freshwater Ecology and Biotechnology Institute of Hydrobiology Chinese Academy of Sciences Wuhan 430072 ChinaUniversity of Chinese Academy of Sciences Beijing 100049 China;

    State Key Laboratory of Freshwater Ecology and Biotechnology Institute of Hydrobiology Chinese Academy of Sciences Wuhan 430072 China;

    State Key Laboratory of Freshwater Ecology and Biotechnology Institute of Hydrobiology Chinese Academy of Sciences Wuhan 430072 China;

    State Key Laboratory of Freshwater Ecology and Biotechnology Institute of Hydrobiology Chinese Academy of Sciences Wuhan 430072 China;

  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 一般性问题;
  • 关键词

    Constructed wetland; Arsenic; Removal efficiency; Mass balance;