首页> 中文期刊> 《东方电气评论》 >仙游电站抽水蓄能机组的调试

仙游电站抽水蓄能机组的调试

         

摘要

Turbine generators for the Xianyou pumped-storage power station is the first EP+TA project designed and manufactured by DFEM since pumped-storage equipment is manufactured domestically, and the first test is also guided on site by Dongfang Electiric Machinery. This paper mainly introduces the basic status, problem encountered and lessons learned during wet test of the unit.%仙游机组是抽水蓄能机组国产化后东方电机自主设计制造的首个项目, 也是国产化后的首个大打包项目, 东方电机首次担任调试督导. 本文叙述了机组有水调试的基本情况及调试中出现的问题和经验教训.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号