首页> 美国政府科技报告 >An Investigation of Techniques to Expedite Synchronizing for Pump-Storage Units and Standby Generating Units,
【24h】

An Investigation of Techniques to Expedite Synchronizing for Pump-Storage Units and Standby Generating Units,

机译:加快抽水蓄能机组和备用发电机组同步的技术研究,

获取原文

摘要

The rapid startup potential of hydro and pumped-storage power is placed at a premium by the increasing preponderance of thermal power sources which inherently have rather sluggish response. To better exploit the rapid startup potential,the latitudes and constraints of synchronizing are examined and means are developed to expedite the synchronizing process. A special synchronizer is developed with compensation for acceleration and with sensitivity to residual voltage. By this means,transients of induction synchronizing are reduced,pull-in torque may be increased,and full voltage synchronizing may be achieved at higher acceleration and in less time for start up of emergency standby units.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号