In this article, the primal-dual interior-point methods are used to minimize costs and losses in a predispatch model for the generation and transmission of direct current (DC) power flow in a hydroelectric system with pre-programmed manipulations;i.e., in cases of preventive maintenance, within a period of twenty-four hours. From the computational standpoint, the effort required to solve a problem with and without manipulations is similar, and the reasons why will be also discussed in this study. Computational results prove these findings.
展开▼
机译:金属和非金属矿山安全和健康调查报告:地下非金属矿(石灰石(压碎和破碎))致命人员意外坠落,2014年2月27日,Interstate power systems,Inc。承包商I.D.位于爱荷华州story County ames的ames mine的martin marietta materials公司的T02号。矿山I.D.第13-00014号