首页> 中文期刊> 《应用数学(英文)》 >Predispatch of Hydroelectric Power Systems with Modifications in Network Topologies

Predispatch of Hydroelectric Power Systems with Modifications in Network Topologies

         

摘要

In this article, the primal-dual interior-point methods are used to minimize costs and losses in a predispatch model for the generation and transmission of direct current (DC) power flow in a hydroelectric system with pre-programmed manipulations;i.e., in cases of preventive maintenance, within a period of twenty-four hours. From the computational standpoint, the effort required to solve a problem with and without manipulations is similar, and the reasons why will be also discussed in this study. Computational results prove these findings.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号