This paper is based on a resource constrained active network project;the constraint of the local resource and the time constraint of the cooperation resource are considered simultaneously.And the respective benefit of the manager and cooperation partners is also considered simultaneously.And a cooperation planning model based on bilevel multi-objective programming is de- signed,according to the due time and total cost.And an extended CNP based on the permitted range for resource and time requests is presented.A larger task set in scheduling cycle is on the permitting for the request of cooperation resource and time while the task manager itself may be permitted biding for tasks.As a result,the optimization space for the cooperation planning is enlarged.So not every bidding task is successfully bid by invitee,and the task manager itself takes on some bidding tasks.Finally,the genetic algorithm is given and the validity and feasibility of the model is proved by a case.
展开▼
机译:Discussion of 'Maximum Gradient Decision-Making for Railways Based on Convolutional Neural Network' by Hao Pu, Hong Zhang, Paul Schonfeld, Wei Li, Jie Wang, Xianbao Peng, and Jianping Hu
机译:La modelisation de la propagation et aides a la Decision pour les systemes deTelecommunications,de Radar et de Navigation(propagation modeling and Decision aids for Communications,Radar and Navigation systems)