首页> 中文期刊>建筑研究(英文) >Time and Cost Planning of a Housing Construction Project Using Building Information Modelling

Time and Cost Planning of a Housing Construction Project Using Building Information Modelling

     

摘要

Conventional ways of building construction process lack proper task scheduling and planning of the project work at the site resulting in poor monitoring of the whole process.Building information modelling(BIM)creates a platform where all the information of every single element of the construction process can be virtually integrated.The integration of 3D elements of a building model with its scheduled time and cost parameters results in 5D BIM.This feature enables the visualization,scheduling,planning,and monitoring and clash detection of all pre-construction,construction and post-construction processes of a building.The present study used the information of a live project of a traditionally built residential building which was remodeled using 5D BIM technique.The purpose of this study was to compare and analyses the impact of 5D BIM on time and cost parameters of the live project.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号