The project is located on downstream of Liuchong River, the north source of Wujiang River and with a distance of 154 km from Guiyang, the capital city of Guizhou Province. It is the upmost cascade of the power development scheme along Wujiang River. The station will be established with an installation of 540 MW, which can provide firm output 171.5 MW and annual energy 1594 GWH. Its reservoir has a total storage of 4925 million m~3 with aregulation capacity of 3361 million m~3 and over-year regulation features; it will contribute to compensation for downstream cascades and increases of firm output and energy supply. With its completion, the project will become a principal power source of peak regulation, frequency modulation improvement and stand-by in the networks.
机译:该项目位于吴江北源六冲河下游,距贵州省会贵阳市154公里。它是吴江沿线电力发展计划的最高梯级。该电站的安装量为540兆瓦,可提供171.5兆瓦的固定产量和1594 GWH的年发电量。其水库总蓄水量为49.25亿立方米〜3,其中 调节能力33.61亿立方米〜3,具有多年调节功能;它将有助于补偿下游梯级,并增加公司的产量和能源供应。随着项目的完成,该项目将成为调峰,调频改进和网络待机的主要动力来源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号