Hongjiadu (HJD) hydropower project which is located in the northern source of the main stream of the Wujiang River is the head hydropower station in the cascade projects of the Wujiang River. It is also one of the start-up projects among "west-electricity transmitted to the east" items. The gate of the diversion tunnel will be dropped down in April, 2004 and a generating unit will firstly generate electricity in July in the same year. The hydrostructures of the project consist of a dam and the structures on the left bank which conclude a spillway, a tunnel spillway, power conduit system, a power house and so on. The damsite is located in the high mountainous region with narrow valleys and karst, and the height of the dam is 179.50m. It is one of the highest concrete faced rockfill dam (CFRD) that is under construction in the world. The dam has been embanked 137m added up 7.0 million m3 at the present time and it underwent twice tests in 2002 and 2003 flood season respectively. The dam will experience the test of water storage in 2004. New technologies, such as narrow continuous plinth with equivalent width and impact compaction by LAND Pac, are adopted in the dam design and construction of HJD CFRD. The article presents the design and construction technique of HJD CFRD.
机译:洪家渡(HJD)水电项目位于乌江干流的北部,是乌江梯级工程的主要水电站。这也是“西电东送”项目中的启动项目之一。引水隧洞的闸门将于2004年4月下水,发电机组将于同年7月首先发电。该项目的水文结构由水坝和左岸的结构组成,这些结构形成溢洪道,隧道溢洪道,电力管道系统,发电站等。坝址位于山谷狭窄,喀斯特地貌狭窄的高山地区,坝高179.50m。它是世界上正在建设的最高混凝土面板堆石坝(CFRD)之一。该水坝目前已堤坝1.37亿,累计增加了700万立方米,并分别在2002年和2003年的汛期进行了两次试验。该大坝将在2004年经历蓄水试验。HJDCFRD的大坝设计和施工采用了新技术,例如具有相等宽度的窄连续基座和LAND Pac进行冲击压实。本文介绍了HJD CFRD的设计和施工技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号