首页> 中文期刊> 《建筑经济》 >地铁建设工程安全文明施工费计取办法研究

地铁建设工程安全文明施工费计取办法研究

         

摘要

以广州市为例,分析地铁工程安全文明施工费计取的现状,指出这一领域存在的问题,并结合施工工法、标段划分以及交地情况等方面探讨问题产生的原因;通过对比北京、上海、天津等地的地铁建设安全文明施工措施和计费办法,借鉴其计取经验,为安全文明施工费的科学计取提出建设性意见。%Taking Guangzhou as an example,this paper analyzes the current situation of metro construction engineering safety and civilized construction measure expense calculation,points out the problems in this area,and explores the reasons from the aspects of construction method,division of tenders and construction land delivery situation. It compares the calculation of safety and civilized construction measure expense in Beijing,Tianjin and Shanghai,extracts their useful experiences,so as to put forward some constructive suggestions for scientific calculation of safety and civilized construction measure expense in metro construction engineering.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号