首页> 中文期刊> 《建筑经济》 >装配式住宅项目多空间鲁棒性调度研究

装配式住宅项目多空间鲁棒性调度研究

         

摘要

以装配式住宅项目为研究对象,从其建造方式及调度特征入手,分析其多空间鲁棒性调度问题;提出基于时间段的多空间调度同步转换技术、以装配空间为主导的多空间协同调度技术、资源限量下的多目标优化技术等核心技术.在此基础上,通过对核心技术的组合应用与实证分析,提出相应决策建议.%Taking the prefabricated building project as research object,the paper analyzes the problem of robust project scheduling in multidimensional area based on the the features of the construction way and scheduling. Then,puts forward the technique of simultaneous transformation in multidimensional areas based on time,the technique of coordination scheduling in multidimensional areas led by assembly working area and the technique of multi-objective optimization at the limit of resource. On this basis,applies the composition of the core techniques with a case study conducted and offers the corresponding suggestions.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号