Static load test abnormal condition analysis and handling condition in booster station comprehensive building in CWE Rudonghai Offshore Wind Farm (Intertidal)100MW Demonstration Project are analyzed in the paper.Precautions during construction such as real-time monitoring,etc.are proposed.%本文介绍了中水电如东海上风电场(潮间带)100MW示范项目升压站综合楼静载荷试验异常情况分析与处理情况,提出了施工中应进行实时监测等需注意的问题。
展开▼